INFO
- Architectural and plant survey
- Executive architectural design
- Executive design of mechanical systems
- Executive design of electrical and special systems
- Works management
- System testing
- Building permits
- Energy Performance Certificate (APE)
- Ex Law 10/91 (Legislative Decree no. 192/05)









DESCRIPTION OF THE INTERVENTION:
The project in question concerns the insertion of a start-up within a building with an industrial style, with the aim of developing technologies for the removal from the atmosphere and the safe and permanent storage of large quantities of CO2 .
Inside the building, removable boxes have been installed, with exposed systems, thus not affecting the infill walls in any way, making the intervention 100% reversible, while optimizing the internal distribution of spaces and energy consumption, with state-of-the-art air conditioning and air exchange technologies.
The project was carried out entirely with the aid of the B.I.M. methodology to analyze the intervention in every detail.